Mining Arch Support Split Set Stabilizers Dolly Pusher High Quality Split Set Driver

Product Description

Product Description
Samples: Available upon request
MOQ: 100 sets
Supply Ability: 1000 sets/Month
Delivery: within 20 working days
Material: 45# steel bar
Production process: Forging, Drilling, Heat treatment, installation of hexagonal hollow steel short tool rod and lathe cutting and other processes.
The operation of the dolly pusher:

Take the dolly pusher tail tool into the rock drill, the front pole body is inserted into the split sets in the ring side, and then use the rock drill and air legs to push the split sets into the drilled holes.

Dia 33mm 39mm 42mm 47mm
Thickness 2.5mm 2.5mm 2.5mm 3.0mm
Ring DIA 6mm 6.5mm 7.0mm 7.5mm
Slot SiZE 10mm 15mm 17mm 20mm
Min Yield Strength 78Kn 88 Kn 95kn 124Kn
Min Breaking Strength 103Kn 116Kn 123kn 160Kn
Max Breaking Strength 117 Kn 132kn 140kn 186 Kn
Elongation >16% >16% 16% 16%
Anchoring 4-7 tons 5-8 tons 5-8tons 6-12tons
Domed Plate 150*150*4mm 150*150*4mm 150*150*5mm 150*150*5mm
Packaging & Shipping

We packed steel rail in bundle packed by steel wire or as your requirement.

Product Ranges

Products are widely used by railroads, mining companies, heavy industries, overhead cranes, railroad and tunneling industries, transit authorities, and operators of port facilities.

Steel Rails
GB light rail, heavy rail, crane rail & other standard steel rails
Railway Accessories
Turnout switch, fish plates, rail clip, rail clamp, track spike, rail bolt/nut/washer, rail pad, etc.
Mining Support Products
Steel arch support, mining anchor bolts, mining plastic composite net, plate washer, etc.
Other Steel Products
Channel steel, angle steel, I-beam steel, mining I-beam steel, U-beam steel, H-beam steel, steel plate, etc.
Certifications
Frequently Asked Questions
QWhat is the Minimum Order Quantity (MOQ)?
The minimum order quantity for our products is 100 sets.
QWhat material is used for the Dolly Pusher?
The dolly pusher is manufactured using high-grade 45# steel bar.
QHow long is the delivery timeframe?
Standard delivery is completed within 20 working days.
QWhat production processes are involved?
Our products undergo forging, drilling, heat treatment, installation of a hexagonal hollow steel short tool rod, lathe cutting, and other advanced processing methods.
QHow do you operate the dolly pusher?
Take the dolly pusher tail tool into the rock drill, insert the front pole body into the split sets on the ring side, and then use the rock drill and air legs to push the split sets into the pre-drilled holes.
QHow are the steel rails packaged?
Steel rails are packed in secure bundles using steel wire or customized to align with your specific shipping requirements.

Related Products